LINE 1
Line 1 connects Versova, Andheri in the Western Suburbs to Ghatkopar in the Eastern
Suburbs, covering a distance of 11.4 kilometres (7.1 mi). It is fully elevated,
and consists of 12 stations.[1] Work on the Versova-Andheri-Ghatkopar corridor,
a part of Phase I, began on 8 February 2008. A crucial bridge on the project was
completed at the end of 2012. The line opened for service on 8 June 2018. Line 1
of Mumbai Metro has 12 stations in the V-A-G corridor, Versova, D.N.Nagar, Azad
Nagar, Andheri, W. E. H., Chakala, Airport Road, Marol Naka, Saki Naka, Asalpha,
Jagruti Nagar and Ghatkopar.
LINE 2
MMRDA announced that Line 2 would be executed in three parts - Mankhurd-BKC, Andheri-Dahisar
and BKC-Andheri. The first two parts are planned to be constructed if they are deemed
to be feasible by a feasibility report.
LINE 3
LINE 3 It will be the first underground metro line in Mumbai, and will consist of
27 stations.The metro line will connect Cuffe Parade business district to SEEPZ
LINE 4
Metro 4 will be built across a 32-km corridor from Wadala to Kasarvadavali, near
Thane, It will also be underground with a partially elevated stretch. Mumbai Metro
Line 1 has ferried more than 90 million passengers within a year since commencement
of operation.
On this website, you can get updated train table for following lines.
Mumbai
Metro Rail Timings - Reliance Metro | Mumbai Monorail Timings | Western Railway TimeTable | Central Railway TimeTable | Harbour Line Time Table | Thane Vashi Panvel Line Time Table
| Mumbai
Local Train Map | Mumbai to pune Trains